Fritsch PULVERISETTE 2 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Spezialmaschinen Fritsch PULVERISETTE 2 herunter. FRITSCH PULVERISETTE 2 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - Operating instructions

LABORATORY - MORTAR MILLPULVERISETTE 2Operating instructionsValid starting with: 02.2000/101Read the instructions prior to performing any task!Transla

Seite 2 - Version 02/2014 Index 009

WARNING!This symbol and keyword combination points out a possiblyhazardous situation that can result in death or seriousinjury if not avoided.CAUTION!

Seite 3

DANGER!This symbol and keyword combination designates contentsand instructions for proper use of the machine with com-bustible substances. Ignoring in

Seite 4 - Table of contents

Designation Explanation1., 2., 3. ...Step-by-step procedure instructionsðResults of steps in the procedureReferences to sections in this manual and re

Seite 5

DANGER!Explosion hazard!– When grinding oxidizable substances, e.g. metals orcoal, there is a risk of spontaneous combustion (dustexplosion) if the sh

Seite 6 - 1 Basic structure

2.7 Hazardous pointsCAUTION!– Crushing hazard when closing the grinding chamber!–Crushing hazard when closing the latch (5)!– Crushing hazard when in

Seite 7 - 2 Safety information and use

3 Technical data3.1 Dimensions410 x 310 x 460 mm (height x width x depth)3.2 Weight24 kg (net)34 kg (gross)3.3 Operating noiseEmissions value of wo

Seite 8

3.8 Final finenessThe final fineness depends on the grinding duration - sufficiently longgrinding times can yield an average particle feed size of 10

Seite 9

4 Installation4.1 TransportWARNING!Improper lifting can lead to personal injury or propertydamage. The machine must only be lifted with suitableequip

Seite 10 - Safety information and use

4.4 Ambient conditionsWARNING!Mains voltage!– The device may only be operated indoors.–The surrounding air may not carry any electrically con-ductive

Seite 11

5 Initial start-upPerform initial start-up only after all work as described in Ä Chapter 4‘Installation’ on page 17 has been carried out.5.1 Switchi

Seite 12

Version 02/2014 Index 009Fritsch GmbHMilling and SizingIndustriestraße 8D - 55743 Idar-ObersteinTelephone: +49 (0)6784/ 70-0Fax: +49 (0)6784/ 70-11e

Seite 13 - 2.6 Protective equipment

6 Using the deviceWARNING!If the grinding elements used are not original accessories,we provide no guarantee and exclude all liability fordamage to t

Seite 14 - 2.8 Electrical safety

6.1.3 Setting the grinding durationThe desired grinding duration can be set with the " + " and " - " buttons.Depending on the set

Seite 15 - 3 Technical data

NOTICE!If liquid nitrogen is added to the grinding process, it is onlypermitted with the monolithic stainless-steel grinding set.With mineral material

Seite 16 - Technical data

n Rotation to the right = clockwise rotationn Rotation to the left = anticlockwise rotationAn arrow on the mortar indicates the direction of rotation

Seite 17 - 4 Installation

6.4 Setting the grinding pressureNOTICE!Before commissioning, it is necessary to adjust (zero posi-tion) the pressure scale (see Ä Chapter 6.5.1 ‘Adj

Seite 18 - Installation

6.4.3 Pre-crushing settings for coarse samplesTo pre-crush coarse samples of up to 8 mm, the adjusting nut (c) can beraised above the zero position i

Seite 19 - 5 Initial start-up

The zero position of the pressure scale can be determined two differentways:n Close the lid and its latch. Start the device (START). The adjusting nut

Seite 20 - 6 Using the device

6.6.1 Setting the scraper1. Turn the screw to the left.2. Release the lever.3. Grip the guide rod.4. Move the scraper against the wall and onto the b

Seite 21 - Using the device

5. Tilt the guide rod while turning the scraper to the left to align itwith the guide rod.6. Clamp the lever. Then release the guide rod.7. Turn the s

Seite 22

6.7 Filling the grinding stock / Starting the grinding process1. Open the latch of the lid. Open the laboratory mortar mill.2. Fill a maximum of 190

Seite 23

Certifications and CE conformityFritsch GmbH has been certified by the TÜV-Zertifizierungsgemeinschafte.V.An audit certified that Fritsch GmbH conform

Seite 24

NOTICE!If liquid nitrogen is added to the grinding process, it is onlypossible when using the stainless steel grinding set (orderno. 462140.00) becaus

Seite 25

7 CleaningDANGER!Mains voltage!– Before beginning with cleaning work, disconnect themains plug and protect the device against being unin-tentionally

Seite 26 - 6.6 Scraper

Should it be necessary to use the seal, but there are prob‐lems with abrasion of the seal (possible with samples whichproduce large amounts of dust or

Seite 27

8 MaintenanceDANGER!Mains voltage– Before beginning with maintenance work, unplug themains plug and protect the device against being unin-tentionally

Seite 28

Functional part Task Test MaintenanceintervalSafety switch Operator safety Does the millstop when thehood isopened?Before each useVentilation slots Co

Seite 29 - Removing the grinding stock

9 RepairsDANGER!Mains voltage!– Before beginning with repair work, unplug the mainsplug and protect the device against being unintention-ally switche

Seite 30

10 DisposalIt is hereby confirmed that FRITSCH has implemented the directive2002/95/EC of the European Parliament and Council from 27th January2003 f

Seite 31 - 7 Cleaning

11 Guarantee termsAs manufacturer, FRITSCH GmbH provides – above and beyond any guar-antee claims against the seller – a guaranty valid for the durat

Seite 32 - Cleaning

This guarantee excludes any costs for transport, packaging or travel thataccrue in the event the product must be sent to us or in the event thatone of

Seite 33 - 8 Maintenance

12 Exclusion of liabilityBefore using the product, be sure to have read and understood thisoperating manual.The use of the product requires technical

Seite 34 - Maintenance

Table of contents1Basic structure... 62 Safety information and use...

Seite 35 - 9 Repairs

Fritsch GmbH excludes any liability, warranty, or other obligation to com-pensate for damages, regardless of whether this liability, warranty, orother

Seite 36 - 10 Disposal

13 Safety logbookDate Maintenance / Repair Name Signature Safety logbook - 41

Seite 37 - 11 Guarantee terms

Date Maintenance / Repair Name Signature Safety logbook - 42 -

Seite 38 - Guarantee terms

Date Maintenance / Repair Name Signature Safety logbook - 43 -

Seite 39 - 12 Exclusion of liability

Date Maintenance / Repair Name Signature Safety logbook - 44 -

Seite 40 - Exclusion of liability

14 IndexAAccident prevention ...7Adjusting the mains voltage ...18Adjusting the vertical pressure scale ...

Seite 41 - 13 Safety logbook

WEEE ...36Weight ...15Working with the device ...20 Index - 46 -

Seite 43

© 2014Fritsch GmbHMilling and SizingIndustriestraße 8D - 55743 Idar-ObersteinTelephone: +49 (0)6784/ 70-0Fax: +49 (0)6784/ 70-11email: info@fritsch

Seite 44

6.3.1 Installing/removing the mortar... 226.3.2 Installing/removing the pestle...

Seite 45 - 14 Index

1 Basic structure1 Lid2 Pestle3 Lid safety switch4 Mortar5 Latch6 Pressure regulator, pestle against mortar wall7 Scraper8 Control panel Basic struct

Seite 46 - - 46

2 Safety information and use2.1 Requirements for the userThis operating manual is intended for persons assigned with operatingand monitoring the Frit

Seite 47

Mining/Metallurgy Ores, coal, coke, slagsChemistry Fertilizers, dyes, pesticides, salts,detergents, synthetic resinsGeology/Mineralogy Rocks (up to Mo

Seite 48

2.3 Obligations of the operatorBefore using the PULVERISETTE 2, this manual is to be carefully read andunderstood. The use of the PULVERISETTE 2 requ

Kommentare zu diesen Handbüchern

Keine Kommentare